ertes
15.02.05, 23:51
Structural faults led to the fatal collapse of a terminal at the Paris Charles
de Gaulle airport last year, an offical inquiry says.
The 750m-euro ($960m;£516m) building was not designed to support the stress it
was put under, and the concrete used in its shell weakened gradually to a
point that pillars pierced through it, the report said.
news.bbc.co.uk/2/hi/europe/4266591.stm